Brand New Floors at New City of Glasgow College

/Brand New Floors at New City of Glasgow College

Brand New Floors at New City of Glasgow College

The City of Glasgow College’s two new city centre campuses will cater for 40,000 students and 1,200 staff.  The circa 70,000m2 development comprises two new buildings constructed on land at Cathedral Street and at Thistle Street on the banks of the River Clyde.

city_sign McKay Flooring Ltd were delighted to win the contract to undertake the specialist Junckers sport and commercial flooring installation and finishing works to The City of Glasgow College City Campus.

Project:  The City of Glasgow College City Campus

Contractor:  Sir Robert McAlpine

Architect:  Michael Laird Architects & Reiach & Hall Architects

This package occurred in the following locations in the building:

  • Level 0 – Hair & Beauty Area, Corridor, Training Restaurant & Bar Area
  • Level 1 – Multipurpose Space & Circulation Area
  • Level 2 – Hair & Beauty Reception
  • Level 3 – Zone 4 – Sports Area
  • Level 6 – Coffee Shop & Raised Access

 

The scope of works covered is as follows:

    • Installation of Junckers Oak 22mm Harmony Ultra Matt
    • Installation of Junckers 38mm BluBat Batten System
    • Installation of Pro-build DPM
    • Installation of Junckers Sylvasport Beech Premium Sports Flooring
    • Installation of Junckers 45mm Blubat Batten System
    • Installation of Pro-build DPM
    • Installation of Court Line Markings
    • Installation of Junckers Combi Skirting
campus-2

Junckers Sylvasport Beech Premium

campus-1

Junckers Sylvasport Beech Premium

 

cogc-riverside-campus_01-920x6192x cogc-riverside-campus_02-920x6642x

coffee-shop

Restaurant

Contact us on 0845 602 7694 to discuss your specification or send your tender to enquiries@mckayflooring.co.uk for a quote.

By |2017-02-25T05:33:46+00:00October 28th, 2016|blog posts, Case Studies|0 Comments

About the Author:

Leave A Comment

Ecore Athletic
Loading...