Subfloor Preparation

//Subfloor Preparation

Subfloor Preparation

Surface preparation is a vital part of any contract. Improper or inadequate preparation can cause premature failure of the system. There are several types of procedures available to produce the most acceptable substrate possible, ready for the installation of one or more of the appropriate sports flooring systems required.

All aspects of subfloor preparation and floorcovering installation should be in accordance with the appropriate standard required.

We undertake subfloor preparation works:

• Liquid and sheet DPM systems
• Levelling Screeds
• Acoustic flooring solutions
• Levelling Cradle and batten undercarriages
• Levelling sprung sports systems

Contact us on 0845 602 7694 to discuss your specification and needs.

By | 2008-04-11T12:14:34+00:00 April 11th, 2008|solid wood floors|0 Comments

About the Author:

Leave A Comment

Loading...